Public capacity map
The hosting capacity disclosure under section 27 a of the Swedish Ordinance on Electricity Network Operations, required since 1 July 2026. Built on the same data as your connection queue. You choose what it shows.
For distribution system operators
Efferia finds the bottlenecks, shows the flexibility need and drafts a connection study in under a minute. Automatically when a request arrives, or manually whenever you choose.
Required in SwedenThe same data produces a public capacity map for the hosting capacity disclosure required in Sweden since 1 July 2026 under section 27 a of the Ordinance on Electricity Network Operations.
Substation and cable lengthGeneration headroom after queue
Proposal: T3 with 1.8 km of underground cable. The cost is an estimate based on Ei reference costs.
Fictional values from a demo network.
Efferia is built by engineers who have worked at DSOs. Your network planners review, adjust and sign off every answer. Efferia removes the hours spent collecting data, preparing route proposals and running calculations, so the time goes into engineering judgement.
Solar, wind, batteries and new load. Every request needs data from your GIS, measured load, a cable route and a cost estimate before you can reply. The grid is not reinforced at the same pace, so the answer has to hold.
Efferia works from your network topology, exported from your GIS, and the measured load at each substation, hour by hour. No Velander formula or type-curve estimates.
A study starts when a request arrives. You can also run calculations manually: add an installation and see how the grid is loaded.
See which substations, transformers and lines limit capacity, and at what time of year.
See how much flexibility or battery capacity is needed, or whether a flexible connection is enough, instead of reinforcing.
The internal map, seen only by your own users, shows hour-by-hour loading of substations, lines and transformers. It also shows the calculated hot-spot temperature of each transformer and how many hours a year backup supply under N‑1 falls short.

Underground cable from the site to the substation, around buildings, water and protected areas. You see the length per land type and the permits likely to be required, and can adjust the proposal directly on the map.
You do not need a request to run a calculation. Add a solar park, a wind farm, a battery or a load and simulate it against the measured load of your substations. Solar and wind output is calculated from each site's location and local weather data.
Each curve shows a typical day, 00:00 to 24:00. Illustrations.
The load duration curve shows the substation's hours sorted from highest to lowest load. Everything above the capacity limit is the flexibility need: how much power, how much energy and how many hours a year.
Hours per year, sorted by load
From the customer's request to the map you publish and the input for your network development plan.
The hosting capacity disclosure under section 27 a of the Swedish Ordinance on Electricity Network Operations, required since 1 July 2026. Built on the same data as your connection queue. You choose what it shows.
Capacity, forecasts and flexibility needs by area, as input for your plan.
Customers submit requests through a form in Efferia that you link to from your website, and follow their case on a status page. Each case holds its status, documents and notes.
Proposed substation, cable route, cable size and cost estimate, in Word for review or as a PDF.
Flexibility needs in MW, MWh and hours, before you commit to reinforcement.
Load growth year by year, and the year each substation runs out of capacity.
Efferia runs on your network model, exported from your GIS, and on the measured load at each substation. You keep your GIS. You send an export, and we set up the import for your system during onboarding.
In the form the customer states what is to be connected, the power and where the installation is located.
Headroom after the queue, cable route, cost estimate and flexibility needs. Automatically in under a minute when the request arrives, or when you choose to start the study yourselves.
Your network planner reviews the study in Word, adjusts it if needed and replies to the customer.
You use Efferia in the browser. Nothing to install or host on your side.
Cost estimates are based on the public reference cost list from the Swedish Energy Markets Inspectorate (Ei), the same list used in revenue cap regulation. An estimate for comparing options, not a contractor's quote.
Each DSO sees only its own network. Your network data is not shared with other customers. The only public output is the capacity map, and you publish it yourselves.
Calculations and simulations run in our own engine and reports are written from templates. The load forecast uses machine learning that is trained and run on our own server. Your network data is never sent to any external AI service.
Your network and metering data are stored and processed in a data centre in Helsinki, Finland, with a provider subject to EU law. Network data is never sold or shared with other companies.
Weather, terrain and map backgrounds come from open public sources. Only a location is sent, never information about your network.
Signing in requires a password and a code from an authenticator app.
The database is backed up and encrypted every night. One copy is kept outside the data centre.
The Swedish Cybersecurity Act sets requirements for security in your supply chain. On request, you get a list of our subprocessors and a description of how your data is protected. If a security incident affects your data, we notify you without undue delay.